North Macedonia-Skopje: IPA - Supervision of Rehabilitation of State road A2 Kumanovo – Stracin, Section I (km 0+000 – km 15+195)

Prior information notice
2 Дек 2019

Опубликован

2 Декабрь 2019

Бюджет

900 000 EUR


Тип тендера

Услуги

Номер

EuropeAid/140580/IH/SER/MK

Донор

EC - Европейская комиссия (ЕК)


Страны

Северная Македония

North Macedonia-Skopje: IPA - Supervision of Rehabilitation of State road A2 Kumanovo – Stracin, Section I (km 0+000 – km 15+195)

2019/S 232-568024

Location — Europe (non-EU)/Republic of North Macedonia

Service Prior Information Notice

1.Publication reference
EuropeAid/140580/IH/SER/MK

2.Procedure
Restricted

3.Programme title
Instrument for Pre-Accession Assistance II (IPA II) – Sector Operational Programme for Transport Sector 2014-2020

4.Financing
Financial Agreement (IPA/2014/037-702) of 10.10.2016 adopting a multiannual Action Programme on Environment and Climate Action and Transport for the years 2014–2016, as amended.

5.Contracting Authority
Ministry of Finance, Central Financing and Contracting Department (CFCD), Skopje, REPUBLIC OF NORTH MACEDONIA

6.Nature of contract
Fee-based

7.Contract description

The scope of this project is supervision of rehabilitation of State road A2 Kumanovo – Stracin, Section I (km 0+000 – km 15+195). The actual length of this section is 15,2 km.
The contractor shall ensure that services for supervision shall be in accordance with all the requirements for quality control, control of quantities, supervision of the work progress, analyses of expenses, implementation of the environmental criteria as well as working on administrative questions during the rehabilitation works and defect liability period.
The contract for works will be in accordance with FIDIC conditions of contract (Red Book — First Edition 1999, Conditions of Contract). Works contract will include activities related to: rehabilitation of carriageway with length of 15,2 km, repairing works on 6 culverts and 2 bridges, rehabilitation works on 2 interchanges, electrical works on interchange, posting of road equipment and road marking as well as implementation of environmental mitigation measures.

8.Indicative budget
900 000 EUR

9.Intended timing of publication of the contract notice
January 2020

10.Additional information
N/a

11.Legal basis(1)
Regulation (EU) No 236/2014 of the European Parliament and of the Council of 11.3.2014 laying down common rules and procedures for the implementation of the Union's instruments for financing external action and Regulation (EU) No 231/2014 of the European Parliament and of the Council of 11.3.2014 establishing an Instrument for Pre-accession Assistance (IPA II), (OJ L 77, 15.3.2014). See Annex A2 of the practical guide. Please be aware that after the United Kingdom's withdrawal from the EU, the rules of access to EU procurement procedures of economic operators established in third countries will apply to candidates or tenderers from the United Kingdom depending on the outcome of negotiations. In case such access is not provided by legal provisions in force, candidates or tenderers from the United Kingdom could be rejected from the procurement procedure.
(1) Please state any specificity that might have an impact on rules on participation (such as geographic or thematic or long/short term).

Remarks:

There must be a minimum period of 30 calendar days between the publication of this prior information notice and the publication of the corresponding contract notice.