Detalles del proyecto

Visión general

Título del Proyecto

Project Readiness Financing for Urban Services Projects - Tashkent Province Sewerage Improvement Project (Project 1) - : Project Management, Coordination and Capacity Building Consultant

Programa País / Plan de Acción
Tender / Procurement notice
15 jul 2019
Extension
14 ago 2019

Publicado

14 agosto 2019

Fecha limite

18 agosto 2019

Presupuesto

1 000 000 USD


Tipo de aprovisionamiento

Servicios

Referencia

53107-001 Package Project Management, Coordination and Capacity Building Consultant

Agencia de Financiación

ADB - Banco Asiático de Desarrollo


Duración estimada

24 meses


Países

Uzbekistán

EXTENSION
Deadline of Submitting EOI: 18-Aug-2019 11:59 PM Manila local time

Selection Profile


Consultant Type Firm
Selection Method Quality and Cost-Based Selection (QCBS)
Source International
Technical Proposal Simplified Technical Proposal (STP)

Selection Title Project Readiness Financing for Urban Services Projects - Tashkent Province Sewerage Improvement Project (Project 1)

Package Number
Package Name : Project Management, Coordination and Capacity Building Consultant

Advance Action Yes

Engagement Period 24 MONTH


Consulting Services Budget USD 1,000,000

Budget Type Estimated

Approval Number
Approval Date
Estimated Short-listing Date 30-Aug-2019
Estimated Commencement Date 02-Dec-2019

Open to non-Member Countries No

Additional Information Possibility of contract extension Not known

Possibility of consideration for downstream assignment Not known

Indefinite Delivery Contract (IDC) No

Country of assignment Uzbekistan

Country of eligibility for national consultants Same as country of assignment


Contact Information Project Officer Jung Ho Kim
Designation Senior Urban Development Specialist
Asian Development Bank
Email jhkim@adb.org


Cost Estimate


Competitive Items Amount in USD

Remuneration and Other Expenses
All activities and inputs in the TOR but not limited to remuneration, per diem, air travel, miscellaneous travel expenses, report preparation, production, and transmission, land transportation, communications, etc. 889,500
Sub-total

889,500


Non-Competitive Items Amount in USD

Provisional Sums 20,000
Contingency 90,500
Sub-total

110,500


TOTAL 1,000,000


Terms of Reference


Primary Expertise project management, financial management,
procurement, institutional and public sector
reforms, monitoring and evaluation, community
outreach, planning engineer

TOR Keywords engineering, project management, capacity
building, resettlement, gender human
resources


Objective and Purpose of the Assignment The Tashkent Province Sewerage Improvement Project will upgrade the centralized wastewater systems
of the six cities, improve sanitation practices in two districts’ rural areas, and build wastewater
planning and operational capacity in the Tashkent Province Suvokova. It is consistent with the ADB
Water Operational Plan 2011-2020, ADB’s Country Operations Business Plan, 2019-2021 for
Uzbekistan, and aligns with previous and ongoing ADB-funded WSS projects. The project contributes
to key operational priorities such as livable cities, governance and institutional capacity
improvement and environmental sustainability enhancement under ADB’s Strategy 2030 as well as the
attainment of Sustainable Development Goals.

The project will be aligned with the following impact: environment, health and living conditions in
Tashkent Province improved. The outputs will result in the following outcome: access to reliable,
sustainable and affordable wastewater services in the cities of Akhangaran, Almalyk, Angren,
Bekabod, Chirchik, Yangiyul and the rural areas of Yangiyul and Chinaz districts improved and
expanded. The project is expected to directly benefit one million people with the following
proposed outputs.

Output 1: Centralized urban wastewater systems in the cities of Angren, Akhangaran, Almalyk,
Chirchik, Bekabod, and Yangiyul improved, including (i) rehabilitation and/or upgrading of five
existing and one new WWTP with a combined capacity of 530,000 cubic meter (m3)/day; (ii)
rehabilitation or construction of 69.3 km of sewerage collectors and 182.5 km of sewerage
networks; and (iii) installation of 50,000 water meters.

Output 2: Decentralized wastewater disposal systems in rural settlements of Chinaz and
Yangiyul districts improved through (i) installation of 23,500 individual household septic tanks;
(ii) provision of 21 septage vacuum trucks to collect and deliver septage to WWTPs for treatment;
(iii) operationalization of a septage management unit in the TPS; (iv) formulation of a septage
management program to rationalize and expand septage collection and disposal services; and (v)
design and implementation of a sanitation and hygiene awareness program to improve community
awareness and understanding of sanitation best practices.
Output 3: TPS wastewater management and project implementation capacity strengthened in the
six cities through: (i) corporate development (including asset management, financial management,
procurement practices, public accountability measures, internal auditing, environmental management,
human resource management, and PPP arrangements); (ii) established service standards and an
advanced wastewater inspection and monitoring system; (iii) improved wastewater O&M capabilities;
(iv) a piloted PPP initiative for O&M of WWTPs and sewerage networks; and (v) introduced mechanism
for community-based decision making processes.

ADB will process a Project Readiness Facility (PRF) to increase project implementation readiness
and thereby facilitate the timely and cost-effective achievement of the project outcomes.
Activities to be conducted under the PRF include three consulting service contract packages: (i)
engineering, procurement, and construction management (EPCM) contract; (ii) the operational design
and business model package (ODBM); and (iii) the project management, coordination, and capacity
building (PMCCB) consultants. The project is estimated to cost around USD 160 million.

The Government of Uzbekistan requested ADB to provide a PRF to conduct detailed engineering design
and assist in the procurement of civil works and equipment, ahead of ADB’s Project Loans for
approval in 2019-2021. The government also requested ADB to select on its behalf all consultants to
undertake the consulting services under the PRF, while the government will retain its authority to
negotiate, sign contracts and engage the Consultants. These consulting services are to be procured
in two packages:
Package 1 Detailed Engineering Design, Procurement and Construction Management (EPCM) – Part 1
Engineering Design and Procurement (lump sum) and Part 2 Construction Management (time-based)
Package 2 Project Management, Coordination and Capacity Building (PMCCB)

Consultants’ selections and engagements will be carried out in accordance with ADB’s Guidelines on
the Use of Consultants (2017, as amended from time to time), using the quality-cost based selection
(QCBS) method with a standard quality-cost ratio of 90:10. All procurement of works, goods and
services will be carried out in accordance with ADB’s Procurement Guidelines (2017, as amended from
time to time).

The activities under the Project Management, Coordination and Capacity Building (PMCCB) consulting
services will be financed by ADB's PRF.


Experts Needed


International

Read only Checkbox Checked Team Leadership from International Experts


Expertise or Position Inputs in PM Primary Place of Assignment Legal Expert I.T. Expert Required in Proposal
1 Project Management Specialist/Team Leader 15 Tashkent, Uzbekistan
2 Financial Management Specialist 7 Tashkent, Uzbekistan
3 Institutional and Services Reform Specialist 8 Tashkent, Uzbekistan
4 Procurement Advisor 7 Tashkent, Uzbekistan
5 Communication Advisor 7 Tashkent, Uzbekistan
6 Public Participation Advisor 3 Tashkent, Uzbekistan

National
Team Leadership from National Experts

Expertise or Position Inputs in PM Primary Place of Assignment Legal Expert I.T. Expert Required in Proposal
1 Planning Engineer (Information Coordination, Scheduling, Planning and Controlling) 1 9 Tashkent, Uzbekistan
2 Project Management Specialist/Deputy Team Leader 12 Tashkent, Uzbekistan
3 Procurement and Contract Management Expert 1 10 Tashkent, Uzbekistan
4 Comunity Outreach Expert 2 Tashkent, Uzbekistan
5 Monitoring and Evaluation/Reporting Specialist 10 Tashkent, Uzbekistan
6 Procurement and Contract Management Expert 2 10 Tashkent, Uzbekistan
7 Environment Specialist 8 Tashkent, Uzbekistan Read only Checkbox
8 Institutional and Services Reforms Specialist 8 Tashkent, Uzbekistan
9 Gender Specialist 8 Tashkent, Uzbekistan
10 Resettlement Specialist 8 Tashkent, Uzbekistan
11 HR and Capacity Building Expert 8 Tashkent, Uzbekistan
12 Planning Engineer (Information Coordination, Scheduling, Planning and Controlling) 1 9 Tashkent, Uzbekistan Team Leadership from National Experts


Hyperlinks to Related Project Dossiers:

http://www.assortis.com/public/files/ADB571352.docx