Detalles del proyecto

Visión general

Título del Proyecto

Strategic Interventions for Economic Transformation - Strengthening Knowledge for Enhancing Development Outcomes (Transport Analyst)

Programa País / Plan de Acción
Tender / Procurement notice
12 jun 2019
Re-advertisement / Re-launch
20 jun 2019
Re-advertisement / Re-launch
28 jun 2019
Re-advertisement / Re-launch
9 jul 2019

Publicado

12 junio 2019

Fecha limite

18 junio 2019

Presupuesto

33 700 USD


Tipo de aprovisionamiento


Consultores individuales

Referencia

52140-001 Package Transport Analyst

Agencia de Financiación

ADB - Banco Asiático de Desarrollo


Duración estimada

11 meses


Países

India

Date Published: 12-Jun-2019 Deadline of Submitting EOI: 18-Jun-2019 11:59 PM Manila local time

Consultant Type Individual
Selection Method Individual Consultants Selection (ICS)
Source National
Technical Proposal Not Applicable

Selection Title Strategic Interventions for Economic Transformation - Strengthening Knowledge for Enhancing Development Outcomes (Transport Analyst)

Advance Action No

Engagement Period 11 MONTH

Consulting Services Budget USD 35,000

Budget Type Estimated

Approval Number 9665
Approval Date 06-Dec-2018
Estimated Short-listing Date 18-Jun-2019
Estimated Commencement Date 28-Jun-2019

Open to non-Member Countries No

Additional Information
Possibility of contract extension Not known

Possibility of consideration for downstream assignment Not known

Indefinite Delivery Contract (IDC) No

Country of assignment India

Country of eligibility for national consultants Same as country of assignment

Contact Information
Project Officer Sabyasachi Mitra
Designation Deputy Country Director
Asian Development Bank
Email sabymitra@adb.org
Contact Person for Inquiries Sanchita Basu Das
Designation Economist
Asian Development Bank
Email sbasudas@adb.org

Agencies

Primary Agency Country Agency Role Contact Person
Asian Development Bank Regional Executing Agency Kanupriya Gupta

Cost Estimate
Cost Items Amount in USD
Remuneration and Other Expenses
All activities and inputs in the TOR but not limited to remuneration, per diem, air travel, miscellaneous travel expenses, report preparation, production, and transmission, land transportation, communications, etc. 32,756
Contingency 944
TOTAL

33,700

Terms of Reference
Expertise Transport Engineer

Expertise Group Project Management/ Institutional Development
TOR Keywords Transport Infrastructure

Source National

Objective and Purpose of the Assignment Economic Development in several states of India has remained constrained for decades. Infrastructure
connectivity within the states, with the rest of India and with neighboring Bangladesh, Myanmar, Nepal
and Bhutan, is critical to promote rapid, inclusive and sustainable growth. ADB has been a key
development partner and supports projects under its SASEC program, with focus on transport, urban and
energy sectors. In addition to projects, ADB also undertakes various studies on (i) macroeconomic and
structural issues and (ii) operation-specific knowledge involving infrastructure related project
planning and implementation capabilities, good practices and new technologies, and policy reforms and
regulatory frameworks.
The North East has been the focus of developmental planning in India. ADB is undertaking a study of the
industrial development and infrastructure in the North East region of India. This study primarily
focuses on industry analysis and transport/logistics infrastructure.

Scope of Work To collect data from primary and secondary sources for the transportation infrastructure in the North
East States, including, Sikkim, Assam, Meghalaya, Manipur, Mizoram, Nagaland, Tripura and the Siliguri
corridor in West Bengal.


Detailed Tasks and/or Expected Output 1. GIS mapping of the NE region defined above.
a. Assist to obtain the data from relevant agencies/departments.
b. Integrate with the GIS data from other available data sources.
c. Create comprehensive GIS for layered network information (including attributes)
d. Prepare GIS maps, as required
2. Data collection
a. Collect data from relevant agencies/departments, such as, NHIDCL, MORTH and various state departments.
b. Augment the data from other available data sources
c. Coordinate with various internal and external departments
d. Compile data in formats, as required by ADB
e. Analyse the data obtained to support the overall study as required by ADB
3. Assist in identification of the Feeder network (mainly consisting of State Highways and MDRs)
connecting the Core and Branch network developed by the ADB Study team.
4. The Data collection, analysis and GIS data base would include road, rail and waterway networks.
5. Assist in preparation of reports and presentations
6. Any other task assigned by ADB.

Minimum Qualification Requirements • A post-graduate degree in Transportation or related specialized fields is required.
• At least 5 years of relevant professional experience in dealing with various aspects of transport
planning, especially, data collection/analysis, preparation and update of the GIS database and maps, is
required
• Strong analytical and strategic thinking skills are required.
• Ability to work in a team is required.
• Excellent oral and written communication skills in English are required.

Minimum General Experience 5
Years

Minimum Specific Experience (relevant to assignment) 5
Years

Regional/Country Experience Required

Schedule and Places of Assignment (chronological and inclusive of travel)

Schedule Type Intermittent

Max. Working Days/Week Home Office 5
Field 6

City and Country Working Days Estimated Start Date Estimated End Date Other Details (use if place selected is Others)
Home Office, Other 20 28-Jun-2019 30-Sep-2019
Other City, India 45 01-Oct-2019 30-Apr-2020 TBD

Total
65