تفاصيل المشروع

نظرة عامة

عنوان المشروع

Arriel 2E Engine Service Support (SBH)

Request for proposal
12 سبت 2019

منشور

12 سبتمبر 2019

الموعد النهائي

1 اكتوبر 2019

الميزانية

 


نوع التزويد

الخدمات

المرجع

NAMSAZ246185

وكالة التمويل

NATO - حلف شمال الأطلسي(الناتو) ووكالة الصيانة والتزويد الدولية التابعة لحلف الناتو


البلدان

لوكسمبورغ

RFP Data

Collective Number
MNE19016

RFP Title
Arriel 2E Engine Service Support (SBH)

RFP Type
Service

Purchasing Organisation
LA - Aviation Support

RFP Closing Date
01 Oct 2019

RFP Control Information

Email Address

procurement62@nspa.nato.int

PURPOSE AND OBJECTIVES
The aim of this document is to set the requirements for the public tender to contract service by the hour (SBH) for the H145M engines (ARRIEL 2E).
This contract is placed to complementary support a contractor ensuring the operation, support (CAMO) and maintenance (AMO) of the helicopters with a define rate of availability.
1.2 BACKGROUND INFORMATION
NSPA, on behalf of the Luxembourg Government has procured two H145M helicopters. According to the current planning the first helicopter shall be delivered in October 2019 and the second helicopter in December 2019.
The helicopters shall be utilized for Police missions.
The helicopters will be progressively introduced into operational services as follow:
1. Initial operational capability (IOC) shall be reached on 1 January 2020 and is defined as the ability to perform the basic law enforcement surveillance mission under VFR conditions operating from Findel Airport.
2. Full operational capability (FOC) shall be reached on 1 January 2021 and is defined as the ability to perform all law enforcement and support missions, including fast roping, bambi-bucket, external loads and hoist operations under VFR and IFR conditions and during periods of darkness with the use of NVGs.
The approximate number of flight hours per year for two (2) helicopter amounts to 600 hours.
1.3 PURPOSE OF THE SOW
This Contract is based on an hourly and cycle rate.
In consideration of the services provided by the Contractor under this agreement, an hourly rate and a cycle rate for every operating hour and cycle of the equipment covered is to be defined by the contractor.

MAINTENANCE AIRCRAFT GAS TURBINE ENGINE
Maintenance for the ARRIEL 2E engines in operation on the H145M in Luxembourg.


Hyperlinks to Related Project Dossiers:

01. Cover Page.pdf(13KB)
https://eportal.nspa.nato.int/eProcurement/DownloadFile.aspx?id=%2fuploadpublicfolder%2feProcurementRFPAttachments%2fMNE19016_RFP%5c01.+Cover+Page.pdf

02. List of Services.pdf(68KB)
https://eportal.nspa.nato.int/eProcurement/DownloadFile.aspx?id=%2fuploadpublicfolder%2feProcurementRFPAttachments%2fMNE19016_RFP%5c02.+List+of+Services.pdf

03. RFP Bidding Instructions.DOCX(42KB)
https://eportal.nspa.nato.int/eProcurement/DownloadFile.aspx?id=%2fuploadpublicfolder%2feProcurementRFPAttachments%2fMNE19016_RFP%5c03.+RFP+Bidding+Instructions.DOCX

04. DRAFT Contract.DOCX(51KB)
https://eportal.nspa.nato.int/eProcurement/DownloadFile.aspx?id=%2fuploadpublicfolder%2feProcurementRFPAttachments%2fMNE19016_RFP%5c04.+DRAFT+Contract.DOCX

05. Statement of Work_v2.0.PDF(805KB)
https://eportal.nspa.nato.int/eProcurement/DownloadFile.aspx?id=%2fuploadpublicfolder%2feProcurementRFPAttachments%2fMNE19016_RFP%5c05.+Statement+of+Work_v2.0.PDF

06. Compliance Matrix.DOCX(19KB)
https://eportal.nspa.nato.int/eProcurement/DownloadFile.aspx?id=%2fuploadpublicfolder%2feProcurementRFPAttachments%2fMNE19016_RFP%5c06.+Compliance+Matrix.DOCX